Bathroom renovation Project, Renovation 11 February 2017 rénovation SDB après travaux Bathroom finished Renovation SDB avant travaux Bathroom before work Rénovation SDB pendant travaux Bathroom during work Client: M Sleight Location: Marseillan (34340) Surface: 5 m² Year: 2016 Détails: Bathroom renovation including bathtub, WC, basin unit, floor and wall tiles Categories: Project, Renovation Tags: Bathroom, Rénovation, WC About Kevin Kelly Related Posts Above ground pool in Marseillanabove ground, concrete, swimming pool Facade Marseillanfaçade, lime based, Marseillan